Daleville Medical Center

This new medical center was a 24,700 sf, one-story structure founded on a shallow foundation system. The structural frame in the main building consisted primarily of structural steel; the mechanical room was framed with reinforced masonry.

Froehling & Robertson, Inc. was asked to provide construction materials testing services for the following building materials:

  • Soils
  • Foundations
  • Reinforcing Steel
  • Concrete
  • Masonry
  • Metals/NDT