Scheduled for completion in 2020, The Berkeley will be an affordable mixed-income residential complex consisting of two five-story apartment buildings and a below grade garage. The buildings are standard construction wood framing, brick and cementitious panel with metal panel accents.
F&R’s project management, engineering and technical staff is on site providing materials testing and inspections during construction of the complex. Our services include inspection/monitoring/observation of the following:
- Support of Excavation including piles, lagging, and tie-backs.
- Waterproofing
- Soils and Earthwork
- Reinforcing Steel
- Cast-in-Place Concrete
- Post-Tension Concrete
- Structural Steel
- Masonry
- Asphaltic Pavements
- Spray-Applied Fireproofing
F&R’s geostructural monitoring team is also on site conducting precondition surveys of adjacent buildings and monitoring of SOE systems.